Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT So...

MIA KARTS BOOKS

Construction Delay Analysis Techniques: Technique Compari...
Skip to product information

    Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution

    $137.00 CAD
     per 
    Available

    Book Details

    Format
    Paperback
    Language
    English
    Category
    Design & Construction
    Condition
    New
    ISBN-13
    9783843350709
    ISBN-10
    3843350701

    Free U.S. shipping on all orders. International shipping is calculated at checkout.

    Guaranteed safe checkout

    Product description

    ISBN: 3843350701

    Author: Al-Gahtani, Khalid S.

    Condition: New

    At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

    View full details

    Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution

    $137.00 CAD
     per 

    You May Also Like

    More in Architecture

    View all
    2021 International Residential Code, Loose-leaf Version
    Mastering Math for the Building Trades
    2018 International Fuel Gas Code Turbo Tabs, Soft Cover Version
    Optimization at Conceptual Design Stage with Morphological Indicators: Design tools towards low material consumption structures
    Designing Information Architecture of Websites: An Ontology-Based Approach
    Kaleidoscopic visions of perceived landscapes: A methodological proposal to grasp the ordinary landscape's perception
    Regeneración de la imagen urbana de Tuxtla: Prospectiva de la capital del Estado de Chiapas; México (Spanish Edition)
    Das Grne Band Europas: Im Spannungsfeld von Naturschutz und Tourismus (German Edition)
    Private Apartment Housing: A Study on Affordability of the Middle Income People of Dhaka, Bangladesh
    TASK MANAGEMENT: Project Management
    Gainsborough (German Edition)
    $43.00 CAD
     per 
    Daylighting and ventilation: Investigation of daylighting and airflow passing through different geometric louvers
    RECENTLY VIEWED PRODUCTS

    Why Shop Miakarts Books?

    Wide Selection

    Discover books across many categories and subjects.

    Secure Checkout

    Shop with a secure online checkout experience.

    Detailed Book Information

    View ISBN, author, publisher, format and other available book details.

    Easy Online Ordering

    Browse, select and order books online.

    Customer Support

    Contact us if you need help with an order or product.