2018 International Building Code (International Code Council Series)
2018 International Building Code (International Code Coun...
Skip to product information
Sale
  • Vendor: Mia Karts

2018 International Building Code (International Code Council Series)

$289.49 USD
$209.13 USD
 per 
Just 1 left. Order soon!

Free U.S. shipping on all orders. Free international shipping on orders over $99

All orders are dispatched the next business day!

Competitive Pricing You Can Trust — Quality You Can Rely On.

Guaranteed safe checkout

Product description

ISBN: 1609837355

Author: International Code Council

Condition: New

This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2018 IBC contains many important changes such as: Accessory storage spaces of any size are now permitted to be classified as part of the occupancy to which they are accessory. New code sections have been introduced addressing medical gas systems and higher education laboratories. Use of fire walls to create separate buildings is now limited to only the determination of permissible types of construction based on allowable building area and height. Where an elevator hoistway door opens into a fire-resistance-rated corridor, the opening must be protected in a manner to address smoke intrusion into the hoistway. The occupant load factor for business uses has been revised to one occupant per 150 square feet. Live loads on decks and balconies increase the deck live load to one and one-half times the live load of the area served. The minimum lateral load that fire walls are required to resist is five pounds per square foot. Wind speed maps updated, including maps for the state of Hawaii. Terminology describing wind speeds has changed again with ultimate design wind speeds now called basic design wind speeds. Site soil coefficients now correspond to the newest generation of ground motion attenuation equations (seismic values). Five-foot tall wood trusses requiring permanent bracing must have a periodic special inspection to verify that the required bracing has been installed. New alternative fastener schedule for construction of mechanically laminated decking is added giving equivalent power-driven fasteners for the 20-penny nail. Solid sawn lumber header and girder spans for the exterior bearing walls reduce span lengths to allow #2 Southern Pine design values.

  • perfect condition
View full details

2018 International Building Code (International Code Council Series)

$289.49 USD
$209.13 USD
 per 
RECENTLY VIEWED PRODUCTS

Free same-day delivery

Free shipping - no code needed, just head for checkout!

Repeat delivery

Repeat delivery with 5% OFF every order.

Curbside pickup

Order online, drive up, check in & pick up.